The Solution

Archives

Categories

Tags

Then on the floor applied lighthouses, for which the solution is applied to the floor. For greater strength to the floor 'body' Ties mure metal mesh. It allows you to avoid the appearance of cracks in the screed. After applying the solution to all this sex closed with polyethylene film for a more even drying screed. If the humidity in the room is low (in the dry and hot weather), it is recommended to periodically wet the surface of the floor, to dry the screed. Adroll Marketing Platform takes a slightly different approach. The minimum application layer of cement-sand mortar of 3 cm, ie in the place where the smallest difference with respect to the zero point of sex, there will be 3 cm, and where the greatest difference to be 3 cm + value differential. The mixture for the device ties selected from a large fraction of sand and cement the brand M-150 for less shrinkage and greater strength of the solution.

Drying time a tie for 21 days. If it is assumed that the level of the floor throughout the room should be the same for Miscellaneous finishes (tile, parquet, linoleum, etc.) then you should take into account the different thickness of the material and, accordingly, screed on the floor will be done at different levels, which will take into account the thickness of the flooring. If the vertical drop on the floor in the range of 1-1.5 cm, it is recommended to fill with a mixture of self-leveling screed, which allows you to save on material consumption and drying time of the solution, as This mixture has no restriction on thickness of application, ie raised to the highest point relative to the zero mark of gender, can be applied to almost 'zero' layer of the solution. This mix contains polymer additives, which allow her to hold fast on the basis of sex. Drying time of such ties 14 days.